Bathroom Remodel Cost: What a Quote Should Include
A bathroom remodel quote is a list. Here is what each line should say, and the questions to ask any contractor before you compare prices.
Nobody can honestly price a bathroom without seeing it, so we are not going to print a number here. What we can do is show you what moves the price and what a quote should list, so you can tell a solid quote from a thin one.
Plenty of guides online print a range and stop there. A range cannot know whether your shower wall is sound or your drain sits in the wrong spot. A quote can, once someone has looked.
A quote is a list, and the price is the sum of the list
Two contractors can walk the same bathroom and hand you two very different prices. Most of the time the job is not different. The lists are.
One quote says “bathroom remodel” and a total. Another names the demolition, the waterproofing, the tile, the glass and the permit. The second one looks higher until you notice the first never said who removes the old tub.
The Federal Trade Commission says an estimate on paper should include a description of the work, the materials, the completion date and the price. It also says not to automatically choose the lowest bidder, and to ask for an explanation if there is a big difference among the estimates.
Florida’s licensing agency, the Department of Business and Professional Regulation, gives the same advice. Get an estimate on paper from several contractors who hold a state license, and make sure it includes the work, the materials, the completion date and the total cost. It also tells owners to beware of anyone who claims to be the fastest or the cheapest.
So your first job is not to find a number. It is to get the same list from everyone you ask.
The lines a bathroom quote should name
Not every bathroom needs every line below. A line that is missing from a quote is still worth a phone call, because a missing line is where a surprise usually starts.
We wrote these as questions for any contractor, us included. Plumbing, electrical and who removes the old tub are on the list because any quote should say who does them. They are not a promise about any one company.
- What comes out
- The tile, tub, vanity, toilet and floor that are going, and who hauls them away. Ask: who removes the old tub, and is hauling in the price?
- The wall and floor under the tile
- What the tile gets set on, and what happens if the demolition shows damage. Ask: who tells me, what is it priced as, and does work stop until I say yes?
- Waterproofing
- The system behind the shower tile, named. Ask: which product, and does it cover the floor and the walls?
- Tile and stone
- The product, the size, the pattern and who buys it. Ask: is my tile in the quote, or is it an allowance (a set amount for the product, where anything above it is mine)? How much extra is ordered for cuts?
- The shower
- The base, the drain and the glass or enclosure, each named. Ask: what is the base made of, and is the glass in this quote or separate? See our shower page for what we install.
- Vanity and top
- The cabinet, the top, the sink and the faucet, and who supplies each. Ask: are the faucet and drain parts in the price? Our vanity page covers the stone tops.
- Plumbing
- Anything moved or reconnected, and the name of whoever does it. Ask: is the plumber in this quote, and whose name is on the permit?
- Electrical
- Lights, fan and outlets, and who does the work. Ask: is any of this being moved or added?
- Permits
- Whether one is needed, who pulls it, and whether it is priced in. Ask: where do I see the permit when it is issued?
- Dates, payments and changes
- A start date, a finish date, the payment steps and how a change gets priced. Ask: where does a change get written down before the work happens?
What comes out, and what is behind it
Demolition is the first honest look at a bathroom. Before the old tile comes off, nobody has seen the wall behind it. A quote written from the doorway is a careful guess about what is back there.
That is not a reason to distrust a quote. It is a reason to ask how surprises get handled. A good answer is short: the contractor stops, shows you, says what the fix is and what it adds, and waits for your yes. A weak answer is “we will take care of it.” You want to hear how, and who pays.
The wall also holds the part of a shower you never see again. Custom Building Products, a maker of tile setting materials, says in a technical paper on shower waterproofing that tile is not waterproof. Cement grout lets water through, and sealing the grout does not stop it completely. Its answer is a waterproof membrane installed before the tile is set.
The same paper says the Tile Council of North America sets the standards for tile in showers, compiled in its Handbook, and that the Ceramic Tile Education Foundation trains and certifies installers in building a tiled shower. So “tile shower” on a quote tells you very little. The line worth finding is the waterproofing.
Tile, stone and the shower: where the price moves
You pick most of what moves a bathroom price. Tile and stone are the clearest case. The product you choose sets what the material costs, and the size and pattern you choose change how much work it takes to set.
Two questions cover most of it. Is the tile in the quote, or is it an allowance? And does the pattern or the size you picked change the labor? A plain run of large tile and a small mosaic band are not the same amount of work, so ask the contractor to say which one they priced.
The shower is the next big mover. It has pieces you can name: the base, the drain, the waterproofing and the glass or enclosure. Ask for each one by name. Custom Building Products notes that sheet membranes involve more steps, more parts and more labor than liquid ones, with waste from scraps, and that sheet membranes are typically more costly than liquids. Neither one is wrong. You should simply know which one is in your quote, and why.
The vanity and its top come last. A stone top and a vanity cabinet are two items, sometimes from two suppliers, so ask who orders each and who sets each. If you want to see the tile and stone side, our bathroom remodeling page has the details. You choose with our help, and our crew sets it.
Plumbing, electrical and permits: ask who, and ask early
Florida’s licensing agency lists plumbers and electricians among the trades that require a state license. Its brochure tells owners to ask to see the license, verify the number with the agency and check for complaints. It also says an occupational license, or a company’s registration as an Inc. or LLC, does not qualify anyone to act as a contractor.
So when a quote includes plumbing or electrical, ask whose license it is, and look it up. If the quote leaves them out, ask who you would hire for them and how that gets scheduled around the tile.
For the tile itself, the Tile Council of North America has a page on finding qualified labor. It tells homeowners to ask for proof of coverage, a license where one is required, and installation qualifications, to interview bidders and to check several references.
Then there is the permit. Here is where your county matters. Pasco County’s permit exemption list says carpet, wood flooring and tile do not need a permit, and neither do replacing an existing faucet, sink or toilet, or replacing a shower glass door. But it also says a permit is still required, regardless of cost, for electrical, plumbing, mechanical, gas and structural work, and for any work on a property in a flood hazard area.
That means a bathroom that only gets new tile and a bathroom that moves a drain are two different jobs on paper. If your home is in Odessa or elsewhere in Pasco County, you can ask Building Construction Services. If it is in Pinellas or Hillsborough, ask that county’s building office the same questions, because the list above is Pasco’s only.
One more point from the state agency: among its warning signs of a contractor without a license is anyone who tries to convince you a permit is not necessary, or that it is cheaper if you get it yourself.
How to compare two quotes
Put the quotes side by side and go down the lines from the list above. Mark each line one of three ways: in the price, left out, or an allowance. Do this before you look at the totals.
Then call each contractor about the lines that differ. Often the answer is simple. One quote includes the glass and the other does not. One names a liquid membrane and the other says nothing. Now the two totals mean something.
The FTC says the contract should carry the contractor’s name, address, phone number and license number, a start and completion date, and any promises made during conversations or calls. It also says to make sure all blank spaces are filled in. A promise you only heard out loud is a promise you do not have.
On money, the FTC says not to pay the full amount up front, and never to make the final payment until the work is done and you are satisfied. The state agency lists a request for all or most of the money up front as a warning sign. Ask what the payment steps are and what each one pays for.
Questions to ask before you sign
Keep these on your phone when you talk to anyone, including us.
- Which lines will be on the quote on paper, and which are allowances?
- Who removes the old tub and takes the debris away?
- What goes behind the shower tile, and does it cover the walls and the floor?
- Who does the plumbing and the electrical, and whose license is on each?
- Does the job need a permit, who pulls it, and is it in the price?
- If you find damage behind the wall, what happens next, and who approves it?
- How do you price and write down a change?
- What do the dates and the payment steps say, and where are they written?
If you are weighing a bathroom, you can read about our shower work and bathroom remodeling, then call for a free estimate and we will talk it through.
Planning a bathroom? Call for a free estimate and bring your questions.
Where we work
Our showroom is in Odessa, in Pasco County, and we work across Pasco, Pinellas and Hillsborough. Tell us which county your home is in, because permit offices differ.
About the author
Andy runs a family company that sells and installs tile, stone and showers. Andy Tsiouklas is the owner of Trinity Tile and Stone. In Andy's words: "My father has been in the construction field all his life, and I ended up going the same route he did, keeping it in the family."
Related work
Bathroom remodeling and showers each have a page with the work we do.