Kitchen Remodel Cost: What a Quote Should Include
A fair kitchen remodel quote lists what comes out, the counters, backsplash, floor and cabinets, and who does the plumbing and electrical.
A kitchen remodel does not have one price, and any page that gives you one number is guessing about your house. What you can know ahead of time is what moves the price and what a quote has to spell out. That is what this guide covers, and we left the dollar figures out on purpose. A figure from a national survey says nothing about your walls, your floor or your layout.
The next best thing is a short list of questions. Ask them of every contractor, including us.
What a quote should cover
Think of a kitchen quote as a list of jobs, each with its own line. When a quote is a single number with a few words beside it, you cannot tell what is in it. Two quotes can look far apart and still describe different kitchens.
The Federal Trade Commission says an estimate on paper should describe the work, the materials, the completion date and the price. Its advice on home improvement also says not to pick the lowest bidder automatically, and to ask each contractor to explain it when the estimates differ a lot. A gap between two quotes is often a gap in what each one counts. Asking is the fastest way to find out which.
Here is what we would want to see on any kitchen quote:
- What is removed, and who hauls it away.
- The floor: what goes down, and what is done to the surface under it.
- The counters: material, edges, sink cutout, seams, installation.
- The backsplash: material, how far it runs, how the edges finish.
- The cabinets: new, refaced or kept.
- Plumbing and electrical: who does them, and whether they are on this quote.
- Permits: who applies for them.
Each of those has its own section below.
What comes out first
Demolition is the line people forget, and it is often where a kitchen job changes. Old counters, old backsplash, old floor and sometimes old cabinets all have to leave before anything new goes in. Whatever is underneath then gets its first honest look.
That matters most for the floor. The Tile Council of North America says you can tile over other floors, but the bonding material has to suit the surface, and the whole structure under the tile has to be sound, and that means more than the top layer. It lists things that keep thinset from gripping, such as wax on old vinyl and leftover carpet adhesive, and it says these have to be dealt with first. So a kitchen with old vinyl or glued-down carpet is a different job from one with a clean slab.
Ask the contractor what they see now and what they might find once it is open. A good answer names the likely surprises. A vague answer, or none, is how a quote grows after the work starts.
Counters: where the lines pile up
A counter looks like one product, but a counter quote holds several jobs. There is the material, the edge shape, the hole for the sink and, in a larger kitchen, the seams. Then there is the installation, and the pieces have to fit your cabinets.
Cambria, a quartz maker, says seams are visible in its product. It also says edges near a sink or dishwasher can chip if struck, and that the walls and cabinets under a counter need to be sound, straight, level and square. Poor preparation, it says, can lead to a weak seam fit or an uneven overhang. A quote that skips the seams and the prep is leaving out the parts that show.
This is where you compare like with like. If one quote lists the edge, the cutout and the install and another gives only the slab, they are not the same offer. Our countertop page lists the stones we install, and our guide to quartz, quartzite and granite covers how each one behaves in a kitchen.
Backsplash and floor are separate lines too
The backsplash is a small area, which is why people leave it as a footnote. Do not. A quote should say what material goes up, how high it runs, and where it ends beside a window or at the edge of a wall.
The tile choice changes the work, so a quote ought to name the tile it is pricing. If you are still choosing, our guide to choosing a kitchen backsplash tile walks through it. When you are ready for the install, that is our backsplash installation work.
The floor is the biggest surface in the room, so the same rule applies with more force. Ask what is going down, and what is being done to the floor under it. Ask whether the quote covers moving the old floor out, and how it handles the line where the new floor meets the next room. A floor that stops at the cabinets is a different job from one that runs under them, so ask which one the quote means.
Cabinets: new, refaced or kept
Cabinets are usually the largest decision in a kitchen, and they are the one a quote most often leaves vague. There are three honest answers. Keep them, reface them or replace them, and the quote should say which.
Refacing and new cabinets are different jobs. So are stock cabinets and custom ones. Ask what the quote assumes, and ask what changes if you pick the other path. We do kitchen cabinets, custom cabinetry and cabinet refacing, and you can read about them on our kitchen cabinets page.
One more thing to ask: does the counter go in after the cabinets, and who measures for it? Counters are cut to the cabinets, so the order of the work matters, and so does who is responsible when the two do not meet cleanly.
Plumbing, electrical and permits
This is the part of a kitchen quote that homeowners most often find missing after the fact. A new sink location, a moved outlet or a new circuit is not tile or stone work. It is plumbing or electrical work. The Florida Department of Business and Professional Regulation lists plumbing among the license categories it regulates, and it runs a license search where you can look up a licensee by name or license number. So ask who does that work, whether it is on this quote, and look the name up yourself.
Ask the same about appliances. Who disconnects the old range, and who hooks up the new dishwasher? If the answer is “you will need someone for that,” then that cost is not on the quote.
Permits need an answer too. In Pasco County, the Building Construction Services exemption list names carpet, wood flooring and tile, and kitchen countertops with no electrical changes, as work that does not need a permit. It also says that list does not apply to homes in special flood hazard areas, and that it is for general information and does not cover every job. The county’s page for alterations lists interior remodels and kitchen upgrades as a type of permit it handles. So a kitchen that moves plumbing or electrical may need one, and a floor or a counter swap alone may not.
That list is Pasco’s. For a home in Pinellas or Hillsborough, check with the permit office for your address. Wherever you live, the FTC warns that a contractor who asks you to get the required building permits yourself is a sign of a possible scam. Ask who applies, in writing.
The 30 percent rule
You may hear that a remodel should cost no more than 30 percent of what your home is worth. Yahoo Finance explains it that way: multiply your home’s current value by 0.3, and use that as a ceiling. It says the 30 percent is for all renovations together, not for each room, and that it is a guideline, not a hard rule. The Penny Hoarder puts it the same way: total spending across all projects, not per room.
Use it as a gut check, not a budget. Your kitchen quote is still built from the lines above: what comes out, what goes in, and who does each part.
Questions to ask any contractor
Here is the whole list in one place. Print it or screenshot it, and ask it the same way each time, so you can lay the answers side by side.
- What exactly comes out, and who hauls it away? Demolition is where a kitchen job changes.
- What is under my floor, and what do you do to it before the new one goes down? The surface decides whether the bond holds.
- Does the counter price include edges, sink cutout, seams and installation? Two quotes only compare if they count the same things.
- Where will each seam fall, and can I see the slab first? Seams show, so you should see them before the cut.
- How far does the backsplash run, and how does it finish at the edges? The edges are where it looks done or not.
- Are the cabinets new, refaced or kept, and what changes if I choose the other one? This is the biggest swing in the job.
- Who does the plumbing and the electrical, and is it on this quote? Plumbing is a license category in Florida, so ask for the name.
- Who disconnects and reconnects the appliances? If nobody is named, you are.
- Who applies for the permit, if one is needed? In Pasco County the answer depends on the work.
- What is not on this quote? The honest ones can tell you in a minute.
How to read the quotes you get back
Lay them side by side and start with what each one leaves out. A quote that is lower because it skips the seams, the permit or the plumbing is not lower. It is shorter.
The FTC says to get a written contract, even if your state does not require one, and to make sure every blank is filled in before you sign. Its list of what the contract should hold includes the contractor’s name, address, phone number and license number, and any verbal promises about the scope of the work. If someone told you out loud that something was included, ask for it on paper.
The FTC also says not to pay the full cost up front, and not to make the final payment until the work is finished and you are satisfied. Both come from the same page, so read it before you sign anything.
You can also do one small thing before you collect quotes. Decide what the kitchen has to do. If you cook a lot, a counter that survives it matters more than a fancy edge. If the floor is the thing you hate, start there. A contractor can only quote what you can describe, and the clearer you are, the less a quote has to guess.
If you want a number for your own kitchen, the way to get it is a visit. We can look at the room, see what is under the floor and what the cabinets are doing, and talk it through with you line by line. Our kitchen remodeling page says what the work involves, and a call to the number below starts the free estimate.
Want to talk through what your kitchen quote should list? Call us, or ask for a free estimate.
Where we work
We work out of Odessa, in Pasco County, and take kitchen jobs across Pasco, Pinellas and Hillsborough. Tell us what is coming out and what is going in, and we will tell you what we would write down.
About the author
Andy's crew installs kitchen counters, tile backsplashes and kitchen floors, and the company does kitchen cabinets too. Andy Tsiouklas is the owner of Trinity Tile and Stone. In Andy's words: "My father has been in the construction field all his life, and I ended up going the same route he did, keeping it in the family."